Conceptual and engineering systems projects for the warehouse located on the Lilo 1 Customs area were prepared for the client.

The conceptual project includes:

  • Facility Layout: Planning of the warehouse layout.

  • Technological Process Flow Schematics: Schematics for the flow of technological processes in the warehouse (movement of materials, personnel, and waste).

  • Description of Technological Processes: Detailed description of the warehouse technological processes.

  • Engineering Systems Requirements: Specifications for engineering systems.

The engineering systems projects include:

  • Heating, Ventilation, and Air Conditioning (HVAC) Project

  • Water Supply, Sewage, and Drainage Project

  • Electrical Supply Project

After completing the renovation work, validation activities were conducted:

  • User Requirements Specification (URS): Development of the user requirements specification.

  • Technical and Functional Specifications (DS & FS): Preparation of the technical and functional specifications.

  • Risk Analysis/Checklists (RA): Risk analysis and checklists.

  • Validation Master Plan (VMP): Main validation plan.

  • Qualification/Assessment of Warehouse Layout and Engineering Systems (DQ): Qualification and assessment of the warehouse layout and engineering systems.

  • Installation Qualification/Verification (IQ): Qualification and verification of the installation of the warehouse and engineering systems.

  • Operational Qualification (OQ) Mapping: Measurement of the functionality of the warehouse and engineering systems (empty warehouse, without products).

  • Performance Qualification (PQ) Mapping: Testing of the warehouse and engineering systems in operation, considering products and seasonal variations (winter/summer).

Final Validation Reports: Summary validation reports.

  • OQ Mapping of Transport Vehicles (in an empty state, without product)

  • PQ Mapping of Transport Vehicles (with product and considering seasonal variations of winter/summer)

A temperature and relative humidity monitoring system from the Czech brand Comet was installed in the transpor VAN.